Wellington Road 11 lane closure planned on Dec. 19 for bridge rehabilitation

MAPLETON – A lane closure is planned on Dec. 19 on Wellington Road 11 between Wellington Road 45 and Mapleton 4th Line.

The closure is part of phase three of the Grand River Conservation Authority’s Conestogo Dam bridge rehabilitation project.

GRCA officials are asking the public to watch out for signs and portable traffic lights in both directions during a single lane closure and drive accordingly.

Lanes will be reopened at 5pm.

Pedestrian and cyclist traffic will be accommodated over the bridge at all times, officials say.

Reporter