CENTRE WELLINGTON – Construction work set to begin on Wellington Road 18 on June 21 will require two road closures for culvert installations and paving operations.
Replacement of culverts near 3rd Line in Centre Wellington will require closure from June 21 to 25.
On June 22 there will be no access to the Belwood Conservation area, but launch facilities in Belwood will be available.
From July 5 to 6 a road closure will be required to accommodate replacement of culverts near 5th Line in Centre Wellington and paving and grading operations form 500 metres east of 2nd Line to the Dufferin County border.
Through traffic is asked to follow posted detour routes.
Local access will be maintained from the east, states an email from Wellington County roads manager Joe de Koning.