Badley Bridge in downtown Elora closed for replacement

Bridge closure – The Badley Bridge on Wellington Road 21, heading into Elora, was closed for replacement as of 7am on Jan. 6. The bridge is scheduled to be reopened in November. Two detour routes (one for passenger vehicles and another for commercial trucks) are posted at the construction site, as well as at www.wellington.ca. There is no access across the bridge during construction, however the Jack R. McDonald pedestrian bridge is open to foot traffic.                     

Reporter

Comments